Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsMechanized Bridge

21m Long, 3.3m Width Heavy Mountain Bridge / Emergency Bridge For Erecting Bridge

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

21m Long, 3.3m Width Heavy Mountain Bridge / Emergency Bridge For Erecting Bridge

21m Long, 3.3m Width Heavy Mountain Bridge / Emergency Bridge For Erecting Bridge
21m Long, 3.3m Width Heavy Mountain Bridge / Emergency Bridge For Erecting Bridge 21m Long, 3.3m Width Heavy Mountain Bridge / Emergency Bridge For Erecting Bridge 21m Long, 3.3m Width Heavy Mountain Bridge / Emergency Bridge For Erecting Bridge 21m Long, 3.3m Width Heavy Mountain Bridge / Emergency Bridge For Erecting Bridge 21m Long, 3.3m Width Heavy Mountain Bridge / Emergency Bridge For Erecting Bridge

Large Image :  21m Long, 3.3m Width Heavy Mountain Bridge / Emergency Bridge For Erecting Bridge

Product Details:
Place of Origin: China
Brand Name: Harzone
Payment & Shipping Terms:
Minimum Order Quantity: negotiation
Packaging Details: According to detailed order
Delivery Time: negotiation
Payment Terms: According to detailed order
Detailed Product Description
Feature: Reusable Capacity: Heavy Loading Capacity
Status: Sefl Fold And Unfold Material: Steel Bridge
High Light:

Wheel Type Striking Bridge

,

Wheel Bridge

                                                            
                                              
Heavy Mountain Bridge is sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle. It is mainly used to erect a bridge with a length of 21m long and a width of 3.3m to ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to go across small medium rivers and dry gaps rapidly.   
                                                           
                                

Specifications for Heavy Mountain Bridge

Tracked load / axle load

55t / 17t

Outline dimension (L*W*H)

13*3.3*3.6m

Gross weight

32.5t

Bridge weight

10.5t

Bridge length

21m

Negotiating length (on hard banks)

19m

Section length

10.63m

Bridge width (when expanding)

3.3m

Track width

1.15m

Section height

0.95m

End section height

0.35m

Operator

2-3

Erection time

10 min

Max. longitudinal slope / lateral slope

±10%  / ±5%

Allowable bank height difference

5%

 

 

 

 

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)